Answer:
60 km/h
Step-by-step explanation:
Let us use the x to represent the speed of the car since it is the smaller value.
Then, the distance covered by the car is 4x since was going 4 kph.
The distance covered by the train is (x+5) times 7 or 7x+35.
We know that the total distance covered is 640 km.
Using this information, we can set up the equation 4x+7x+35=640.
By subtracting both sides by 35 and combining the x's, we get a new equation of 11x=605.
After this, we divide both sides by 11 and get x=55.
Lastly, we add 5 to 55 since the train is 5 km faster than the car and that x stood for the car.
Train=60 km/h
Answer:
$304.63
Step-by-step explanation:
From the information provided, the total cost can be calculated by multiplying the price of each item for the amount purchased and adding up the results:
Total cost=($87.98*2)+($14.57*3)+($21.24*4)
Total cost=$175.96+$43.71+$84.96
Total cost= $304.63
According to this, the answer is that their total cost is $304.63.
Answer:
No
Step-by-step explanation:
They are independent iff:
P(F & D) = P(F) × P(D)
15.278/100 = (55/100) × (27.778/100)
0.15278 = 0.125279 (false)
Therefore, not independent
Answer: 7
Step-by-step explanation:
9/6 = 1.5
1200 x 1.5 = 1800 (t-shirts a work day)
12 600/1800 = 7
7 work days
Answer:
u = 5.176 oz
Step-by-step explanation:
Given:
standard deviation = 0.4
P(x>6) = 2℅ = 0.02
The complement role:
P(A°) = P(not A)
= 1 - P(A)
P(x<6) = 1, P(x>6) = 1 = 0.02 =
= 1-0.02 = 0.98
Taking the closest probability 0.9893 which is on row 2.0 column .06 in the probability table, we now have a z score of
2.0 + 0.06 = 2.06
Zo = 2.06
Therefore, Z score is expressed as
Zo = (x -u) / sd
We already know Zo = 2.06
x = 6
u = ?
sd = 0.4
Therefore,
2.06 = (6 - u) / 0.4
= 2.06 * 0.4 = 6 - u
u = 5.176