Answer:
It takes 46 minutes for 10 people to paint 3 walls
It takes 92 minutes for 10 people to paint 6 walls (twice as long because you have twice as many walls)
You only have 4 people to paint the walls instead of 10 people
Therefore it will take 2.5 times as long (10/4=2.5)
2.5*92=230 minutes
Answer:
x=26 is the answer
Step-by-step explanation:
Answer:
y = -x + 4
Step-by-step explanation:
The point-slope formula for a straight line is
y – y₁ = m(x – x₁)
x₁ = -1; y₁ = 5; m = -1 Substitute the values
y – 5 = -1(x + 1) Remove parentheses
y – 5 = -x - 1 Add 5 to each side
y = -x + 4
The graph is a straight line with a y-intercept at y = +4 and a slope = -10/10
= -1.
Answer:
=============================
The horizontal line has same y- coordinate for each x- coordinate, and is parallel to the x-axis so it is:
The vertical line has same x- coordinate for each y- coordinate, and is parallel to the y-axis so it is:
<em>Refer to graphs.</em>