Answer:
Explanation:
Reorder point quantity is the level at which an inventory is expected to be restocked , calculated by finding the sum of demand over the lead time and the safety stock days
Daily usage = 800 feet / day
Lead time = 6 days
Desired service level = 95%
Risk level = 1-0.95 =0.05
safety stock at 0.05 = 1800
Reorder point = expected demand in (LT) + safety stock
= (800*6) + 1800
= 4800+1800 = 6600 feet.
Answer:
Eng grammar
Explanation:
Comma is Basically a 1 second pause after the word so when you say the above mentioned sentence then a one second pause is required after the word rain..
Hope I Helped
Pls mark as Brainliest.
Answer:
Average cost units in inventory=$1,205
Explanation:
August 8
Weighted average cost in August 8
=( (2 × 100 )+ (3 × 250))/5=$190
Cost of goods sold in August 15 = 190× 3= 570
Balance in inventory in August 15 = 950
- 570 =380
Weighted average cost in August 25 = 380 + (3* 275)/(2+3)= 241 per
Average cost of units = $241 per unit
Average cost units in inventory in August 25= $241×5
=1205
Average cost units in inventory=$1,205