-1 = 3x - 7
Add +7 to each side
6 = 3x
Divide each side by 3
X = 2
f(-1) = 3 * 2 - 7
Answer:
1 extra worker
Step-by-step explanation:
If three workers load the truck in 8 minutes we have that:
3 workers = 8 minutes
We know that if we wanted to reduce the time at, for example, half, we would need to increase the workers in a half. More generally, if we want to reduce the time in 1/X me need to multiply the workers by X.
Here me need to reduce the time in 6/8 as 8*6/8 = 6. So, we will need:
3*8/6 = 24/6 = 4 workers.
So, we will need 1 more worker as we already have 3.
Answer:
what site is this on?
Step-by-step explanation:
here, it's not clear , but visible
Consider the bottom most rectangle.
Its length = 5 - 2 = 3 units
Its width = 3 - 1 = 2 units
So, its area = 3(2) = 6 square units.
Consider the middle rectangle.
Its length = 2 - 1 = 1 unit
Its width = 4 - 2 = 2 units
So, its area = 1(2) = 2 square units.
Finally, consider the top rectangle.
Its length = 6 - 1 = 5 units
Its width = 6 - 4 = 2 units
Its area = 5(2) = 10 square units.
Hence, total area = 6 + 2 + 10 = 18 square units. Correct option is C.