That's two half lives. 5/8 * 2 * 2 = 20/8 = 5/2 pounds7/8 * 2 * 2 = 28/8 = 7/2 pounds
Answer:
Step-by-step explanation:
its really simple
just use your brain
4/4 makes 1 whole and 12-11=1 we need to convert the fraction into a whole number. So what over 4 makes 11 wholes? just do 4x11=44 and 44/4=11 and 12-11=1 just do the same for the other ones
Answer:
$68 to hire and 28.25 per hour to hire both
Step-by-step explanation:
Answer:
25 seconds
Step-by-step explanation:
Hi there!
In order to answer this question, first we need to know how many bolts per second are produced by each machine, this can be known by dividing the number of bolts by the time it takes.
For machine A:

For machine B:

So, if the two machines run simultaneously, we will have a rate of prodcution of bolts equal to the sum of both:

Now, we need to know how much time it will take to producee 200 bolts, to find this out we need to divide the amount of bolts by the production rate:

The <em>bolts</em> unit cancell each other and we are left with <em>seconds</em>

So it will take 25 seconds to produce 200 bolts with machine A and B running simultaneously.
Greetings!
X - tickets
----------------------------------
167x + 19x + 16 = 1132
186x + 16 = 1132
186x = 1132 - 16
186x = 1116
x = 1116 : 186
x = 6 tickets (answer).