Answer:
$256,284
Explanation:
The computation is shown below:
First, Calculate the predetermined overhead rate per hour which equals to
= (Estimated manufacturing Overhead cost ÷ estimated machine hours)
= ($235,900 ÷ 20,800 hours)
= $11.34 per hour
So, the applied overhead or manufacturing overhead allocated equals to
= Predetermined overhead rate per hour × actual machine hours
= $11.34 per hour × 22,600 hours
= $256,284
Answer:
here ya go this is the steps
the answer is B, resolve conflicts peacefully
The rate of photosynthesis would be slowed down, the rapid heat increase would put the plant into a sort of shock, slowing down the cells activities and then the plant would eventually die