1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Zinaida [17]
3 years ago
14

The freemen's bureau was the U.S.' first ____ program.​

Computers and Technology
1 answer:
Ludmilka [50]3 years ago
6 0

Answer:

welfare

Explanation:

The Freemen's bureau was the first Welfare program in the US that was put forward in the year 1865 just after the assassination of Abraham Lincoln. It was headed by Oliver O Howard. And it was brought for providing the food, clothing, medical care, and education to the recently freed white refugees and the freed slaves. And it was supposed to be a kind of welfare.  

You might be interested in
What do you understand by storage devices ? Name any two storage devices.​
MatroZZZ [7]

Answer:

Types of storage devices

Primary Storage: Random Access Memory (RAM) Random Access Memory, or RAM, is the primary storage of a computer. ...

Secondary Storage: Hard Disk Drives (HDD) & Solid-State Drives (SSD) ...

Hard Disk Drives (HDD) ...

Solid-State Drives (SSD) ...

External HDDs and SSDs. ...

Flash memory devices. ...

Optical Storage Devices. ...

Floppy Disks.

6 0
3 years ago
Read 2 more answers
michelle works in retail and cant decide what products to include in the stores front window display. what is the first step she
Nataliya [291]

Correct answer is state the problem

5 0
3 years ago
Read 2 more answers
I am trying to code a lifting simulator game on ro-blox. These problems listed in the third picture tells you the problems. If y
Andru [333]
I have no idea but keep grinding
7 0
3 years ago
_________ is the biggest problem you can face if you don’t identify the scope of your risk management project. Scope creep Nonco
mart [117]

Answer: Scope creep

Explanation:

 Scope creep in the project management basically refers to the uncontrolled development or growth in the project creep. It basically occur when the project scope are not appropriately defined.

It usually involve lack of change in the control system and increase the complexity of the project. It is also has poor requirement analysis.

So, that is why it is the biggest problem we usually face in the project management.

5 0
3 years ago
Compare the elements of the basic Software Development Life Cycle with 2 other models. How are they similar? How are they differ
Artemon [7]

Answer:

Explanation:

One of the basic notions of the software development process is SDLC models which stands for Software Development Life Cycle models. SDLC – is a continuous process, which starts from the moment, when it’s made a decision to launch the project, and it ends at the moment of its full remove from the exploitation. There is no one single SDLC model. They are divided into main groups, each with its features and weaknesses. The most used, popular and important SDLC models are given below:

1. Waterfall model

2. Iterative model

3. Spiral model

4. V-shaped model

5. Agile model

Stage 1. Planning and requirement analysis

Each software development life cycle model starts with the analysis, in which the stakeholders of the process discuss the requirements for the final product.

Stage 2. Designing project architecture

At the second phase of the software development life cycle, the developers are actually designing the architecture. All the different technical questions that may appear on this stage are discussed by all the stakeholders, including the customer.  

Stage 3. Development and programming

After the requirements approved, the process goes to the next stage – actual development. Programmers start here with the source code writing while keeping in mind previously defined requirements. The programming by itself assumes four stages

• Algorithm development

• Source code writing

• Compilation

• Testing and debugging

Stage 4. Testing

The testing phase includes the debugging process. All the code flaws missed during the development are detected here, documented, and passed back to the developers to fix.  

Stage 5. Deployment

When the program is finalized and has no critical issues – it is time to launch it for the end users.  

SDLC MODELS

Waterfall – is a cascade SDLC model, in which development process looks like the flow, moving step by step through the phases of analysis, projecting, realization, testing, implementation, and support. This SDLC model includes gradual execution of every stage completely. This process is strictly documented and predefined with features expected to every phase of this software development life cycle model.

ADVANTAGES  

Simple to use and understand

DISADVANTAGES

The software is ready only after the last stage is over

ADVANTAGES

Management simplicity thanks to its rigidity: every phase has a defined result and process review

DISADVANTAGES

High risks and uncertainty

Iterative SDLC Model

The Iterative SDLC model does not need the full list of requirements before the project starts. The development process may start with the requirements to the functional part, which can be expanded later.  

ADVANTAGES                                        

Some functions can be quickly be developed at the beginning of the development lifecycle

DISADVANTAGES

Iterative model requires more resources than the waterfall model

The paralleled development can be applied Constant management is required

Spiral SDLC Model

Spiral model – is SDLC model, which combines architecture and prototyping by stages. It is a combination of the Iterative and Waterfall SDLC models with the significant accent on the risk analysis.

4 0
3 years ago
Other questions:
  • What does hdtv stand for
    7·2 answers
  • Nathan wants to create multiple worksheet containing common formatting styles for his team members. Which file extension helps h
    5·1 answer
  • What is the main purpose of cutting plane line arrows?
    7·1 answer
  • Assignment 3: Chatbot
    11·2 answers
  • A flat-panel detector is exposed with nothing between the x-ray tube and detector. 5 images were acquired on 5 different days us
    6·1 answer
  • PLEASE HELP!! Kou converged his Word document to a PowerPoint document. When he received the PowerPoint, he was missing material
    12·1 answer
  • EASY What does the Backspace key do?
    6·1 answer
  • Decision support systems help managers use structured data to identify problems and find solutions to business-related problems.
    10·1 answer
  • A type of user interface that features on- screen objects, such a menus and icons, manipulated by a mouse.
    7·1 answer
  • How many accelerometers are there in an IRS system?
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!