Answer:
HM > CH
Step-by-step explanation:
You are correct, I didn't see the option HM > CH, which is correct, since the angle 90 degrees is larger than the angle 73, and then the sides opposite to them must follow suit.
Therefore, the correct answer is: HM > CH
Answer:
11 shirts
Step-by-step explanation:
Since 12 of the 45 minute are devoted to setup, the actual printing time is 33 minutes. At 3 minutes per shirt, that's enough time for ...
(33 min)/(3 min/shirt) = 11 shirts
A batch consists of 11 shirts.
_____
<em>Alternate solution</em>
Another way to consider this is to realize that the setup time is the time required to print 4 shirts. 45 minutes would be enough time to print 45/3 = 15 shirts, but the time for 4 shirts is spent setting up. That leaves the batch size at 15 -4 = 11 shirts.