Answer:
$750 Unfavorable
Explanation:
The calculation of variable overhead efficiency variance is shown below:-
Variable overhead efficiency variance = (Actual direct labor hours - Standard hours allowed) × (Variable factory overhead ÷ Factory overhead rate)
= (10,000 hours - 9,500 hours) × ($18000 ÷ 12000)
= 500 hours × $1.5
= $750 Unfavorable
Therefore for computing the variable overhead efficiency variance we simply applied the above formula.
Answer:
An increase in Price and decrease in Quantity.
Explanation:
Please see the attached Decrease in Supply when Demand is Constant Diagram for further explanation:
<em>Supply Curve </em>is always upward because Supply and Price are directly proportional as shown in attached diagram as S
.
<em>Demand Curve</em> is always downward because Demand and Price are inversely proportional as shown in attached diagram as D
.
The point where Demand Curve and Supply curves meet each other or intersect each other is called <em>Equilibrium </em>as shown in the attached diagram as E. At this the point Quantity Demanded and Quantity Supplied are equal.
The point at which Equilibrium touches the price is called Equilibrium Price as shown in the attached Diagram as P. At this point the Quantity Demanded and Quantity Supplied are equal.
The Point at which Equilibrium touches the quantity is called <em>Equilibrium Quantity</em> as shown in the attached Diagram as Q. At this point the Quantity Demanded and Quantity Supplied are equal.
Since the Demand is constant D and Supply is decreasing, So when the Supply decreases it shifts towards its left side as shown in the attached diagram as S'.
After decrease in Supply the changes it brings a new Equilibrium point as E' at which Equilibrium Price rises to P' and Equilibrium Quantity falls to Q' as shown in the attached diagram. At this point the Quantity Demanded and Quantity Supplied are equal.
Answer:
the minimum acceptable price of this special order is $410.
Explanation:
Minimum acceptable price for the special order is the price that gives a Incremental<em> contribution margin of zero</em> or <em>a price that covers all costs related to supporting the special offer</em>.
Since the company has <em>excess capacity</em>, ignore the fixed costs as these are irrelevant for this decision
Costs to Provide for the Special Offer : Minimum acceptable price
Direct materials $150
Direct labor $60
Manufacturing support $105
Marketing costs $95
Minimum acceptable price $410
The ability to pay attention to, or carry out, two or more different tasks simultaneously is known as Divided attention
<h3>What is
Divided attention?</h3>
The ability to process more than one piece of information at a time is referred to as divided attention. Deficits in divided attention are caused by a reduced capacity for cognitive processes following a TBI. Relevant information may be missed if the system becomes overloaded.
Divided attention is the ability to pay attention to two tasks at the same time, such as cooking a meal while talking to a friend or driving a car while talking to a passenger - neither activity is interrupted in order to carry out the other.
When your mind is split between multiple tasks or ideas, you have divided attention. People do this all the time, also known as multitasking. Examples include singing along to a song while driving and conversing.
To know more about Divided attention follow the link:
brainly.com/question/4122584
#SPJ4
Answer:
d. $8.69
Explanation:
Activity rate for Activity 2 = Estimated Overhead Cost / Expected Activity
Activity rate for Activity 2 = $19,987.00 / 2300
Activity rate for Activity 2 = $8.69 per activity