A unit cost<span> is the total expenditure incurred by a company to produce, store and sell one </span>unit<span> of a particular product or service. </span>Unit costs<span> include all fixed </span>costs<span>, or overhead </span>costs<span>, and all variable </span>costs<span>, or direct material </span>costs<span> and direct labor </span>costs<span>, involved in production.</span>
Answer:
Step-by-step explanation:
This line is describing the hiker's speed.
In the first hour you can see the line is straight, so this means the speed is constant.
From this first hour to the second hour you will see the line drops, and this means the constant speed slows down within that hour.
Finally, from the second hour to the third hour you see a line moving up, and this means the speed increases during this time.
The choice that is correctly represented by this graph would be the third choice.
Answer:
A’ is (3,-3)
B’ is (-1,-4)
C’ is (-1,2)
D’ is (3,1)
Step-by-step explanation: i forgot how i did this but i did it last week in math or somthing sorry if its wrong it was right for me
Answer:
3440
Step-by-step explanation:
The total number of people polled is 150.
The total number of people who said they'd vote for Candidate #2 is 78.
The number of undecided voters is 7.
Assuming undecided voters don't vote, Candidate #2 can expect to win 78/143 = 54.5% of the votes.
75% of the 8400 registered voters will vote, or 6300.
So Candidate #2 can expect to win 3440 votes.