4x - 8, 4x just means four of x, and eight less means to subtract 8.
Remember that

is

. We know form our problem that

and

, so:



Now, to find

, we just need to evaluate

at 3. In other words, we are going to replace

with 3:


We can conclude that the correct answer is <span>
C.6(3) – 4 + 3^2 </span>
Answer = B - 33yd
Because the perimeter is all the sides added up so you do length + length + width + width = 11.5 + 11.5 + 5 + 5 = 33
Answer:
I don't normally really really really really really really really really
Answer:
The claim that the current work teams can build room additions quicker than the time allotted for by the contract has strong statistical evidence.
Step-by-step explanation:
We have to test the hypothesis to prove the claim that the work team can build room additions quicker than the time allotted for by the contract.
The null hypothesis is that the real time used is equal to the contract time. The alternative hypothesis is that the real time is less thant the allotted for by the contract.

The significance level, as a storng evidence is needed, is α=0.01.
The estimated standard deviation is:

As the standard deviation is estimated, we use the t-statistic with (n-1)=15 degrees of freedom.
For a significance level of 0.01, right-tailed test, the critical value of t is t=2.603.
Then, we calculate the t-value for this sample:

As the t-statistic lies in the rejection region, the null hypothesis is rejected. The claim that the current work teams can build room additions quicker than the time allotted for by the contract has strong statistical evidence.