Is that the question or is there more to the problem?
Cannot be factored..... I think
$ 50 for 5 hours......50/5 = 10...thats $ 10 per hr
so the equation would be : y = 10x...with x being the number of hrs and y being the total cost.
So ur x axis will be the hours and your y axis will be the total cost.
so ur answer is :the title of the graph is cycle renting. the x axis (the horizontal axis)...since it is the hours, will be labeled 0,1,2,3,4,5,6
the y axis (the vertical axis)...since it is the total cost, will be labeled
0,10,20,30,40,50,60. points are plotted on (1,10),(2,20), and (3,30)
Graph A <==
Answer:
Whole, natural, integer, rational, real
Step-by-step explanation:
15/5 can be rewritten as 3.
Answer:
a
Step-by-step explanation:
the over all total equals 200 and you can not subtract the 2 variables to get the total you have to add them