Answer:
4.75% probability that the line pressure will exceed 1000 kPa during any measurement
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

What is the probability that the line pressure will exceed 1000 kPa during any measurement
This is 1 subtracted by the pvalue of Z when X = 1000. So



has a pvalue of 0.9525
1 - 0.9525 = 0.0475
4.75% probability that the line pressure will exceed 1000 kPa during any measurement
3/4 because 1/2 equals 50% and 1/4 plus that would be 75% less than 6/8
The roof will be in the shape of an isosceles triangle with a base length of 30 m and two sides that are 17 m. The two 17 m beams will have the same angle of elevation since they have to might in the middle.
So to find the angle of elevation, we can split the roof in half vertically to create a right triangle. The base will now be 15 m, and the hypotenuse will be 17. Now we can use a trigonometry function to solve for the angle. We know the hypotenuse and the side adjacent to the angle, so we can use cosine.




The answer is 28.1 degrees
It represente the absolute value