Answer:
$144,592
Explanation:
The computation of the after tax salvage value is shown below;
We assume that after 2 years, 52% of the equipment cost would be written off so the remaining basis i.e.
= $319,000 × 48%
= $153,120
The tax loss is
= $153,120 - $140,000
= $13,120
ANd, the tax rate is 35%
So,
= $13,120 × 0.35
= $4,592
Now the after tax salvage value is
= $140,000 + $4,592
= $144,592
To
determine the net requirement for c, we determine first the number of c’s that
are required for the production of a and b given that there are already 25
units of b available.
<span> Number of c needed = (50 units of a)(2
c/unit of a) + (60 – 25 units of b)(5 c/unit of b)</span>
<span> Number of c needed = 275 c’s</span>
There
are currently 160 units of c; hence,
<span> Net requirement for c = 275 c – 160 c</span>
<span> Net requirement for c = 115</span>
<span>Answer:
115</span>
Answer:
The answer is 'Buy a Stock Index Future'
Explanation:
To take best advantage of this situation, Mr Smith should go long(buy) on this stock.
Stock Index Future js a method of derivates. Futures, like forward contract is a forward commitment which obligates the buyer to purchase an asset or the seller to sell an asset and have a predetermined future date and price. Future is used to hedge against worse future situations.
Answer:
B. Ladder safety or personal fall arrest systems
Explanation:
Under the provisions of OSHA laws, where the total length of a climb equals or is greater than 24 feet or 7.3 meters, ladders must be equipped with one of the following safety devices.
- ladder safety devices
- Self-retracting lifelines, and rest platforms at intervals not to exceed 150 feet (45.7 m)
- A cage or well and multiple ladder sections with each ladder section not to exceed 50 feet (15.2 m) in length.
The safety devices are cautionary provisions to protect a climber should the unexpected happen.To ascend a height of 24 feet and more is exhausting, which poses a risk. The climber may feel dizzy or develop height phobia due to exhaustion.
Answer:
b. $105.00
Explanation:
The computation of the activity rate under the activity-based costing system is shown below:
For Activity 3,
The activity rate is
= Estimated cost ÷ Estimated activity
= $52,500 ÷ 500
= $105
We simply divided the estimated cost by the estimated activity to get the activity rate
All other information which is given is not considered. Hence, ignored it