Answer: Statement A
Explanation: Direct cost are those costs which are variable in nature and can be allocated to the total units of output produced, these are easily traceable. Examples - direct material, direct labor and piece rate wages etc.
Indirect costs are those cost which cannot be allocated to the number of units produced on individual basis unlike direct cost these costs can be either fixed or variable in nature. Examples - rent expenses, administrative expenses.
.
From the above explanation we can conclude that statement A is correct.
The answer should be A, as grants and scholarships are easier to attain
Answer:
$3.20 per unit
Explanation:
In this question, we have to compare the cost between two cases
In the first case, the total cost per unit would be
= Direct materials per unit + direct labor per unit + overhead cost per unit
= $11 + $25 + $17
= $53
In the first case, the total cost per unit would be
= Purchase price + overhead cost
= $48.55 + $17 × 45%
= $48.55 + $7.65
= $56.20
So, the difference would be
= $56.20 - $53
= $3.20 per unit
Answer:
c. The systematic risk of a portfolio can be effectively lowered by adding T-bills to the portfolio.
Explanation:
If we want to less the systematic risk of the portfolio so we have to add the t-bills so that the systematic risk could be minimized
The other statements that are mentioned are incorrect as for risk these statements are wrong
So only c option would be considered as correct
Hence, the correct option is c.