Answer: assembly projects , array projects
Explanation: System Scope describes the current systems that the required application package is expected to replace or interface with. As per the typology developed by Shenhar and Dvir, system scope ranged from assembly projects that included projects that dealt with building a single component, to array projects that included a wide dispersal of interactive systems and subsystems. The typology of Shenhar and Dvir characterized projects based on the attributes of technological uncertainty and complexity of scope.
Answer:
Because you chose to go to college instead of working, your opportunity cost is actually the sum of your college expenses plus the money you could have earned had you chosen not to work.
Explanation:
There are five main categories of expenses to think about when figuring out how much your college education is really going to cost: tuition and fees, room and board, books and supplies, personal expenses, and transportation. You can control some of these costs to some extent.
Answer:
$398,000
Explanation:
Data provided
Projected benefit obligation = $4,870,000
Plan assets = $4,472,000
The calculation of pension liability on Noble's balance sheet is shown below:-
= Projected benefit obligation - Plan assets (at fair value)
= $4,870,000 - $4,472,000
= $398,000
Therefore for computing the pension liability on Noble's balance sheet we simply deduct the plan assets from projected benefit obligation.