Answer:
scarcity, tradeoffs, efficiency, and opportunity costs.
Answer:
The optimal production plan gives a total costs of $417,672 for the periods Feb to May
In Feb we will have to hire 26 workers to close the gap between demand and production from our 100 existing workers
In March however, we will have to lay them off (26 workers) to keep our production in line with demand.
In April, we are constrained to 100 workers, thus requiring that we run overtime. The overtime requirement is between 3,060 hours to max of 5,000 hours. Note that inspire of the hours chosen, demand for April still won't be fulfilled.
The best option will be the one that gives us last backlog because of the costs of backorder being extremely costly.
5,000 overtime hours in April is the best option .
In May, we are constrained to our 100 workers, meaning we will fulfill our back orders and also retain inventory in hand of 7,760 units.
The 3 pages attached show how the cost is worked out and the presentation as well.
Answer:there’s all of them word it differently please
Explanation:
Lesson two unit lab for advertising sales promotion
Profits not always the point
1) Consistent, Competitive & Profitable
2)doing good
3)finding a purpose
4. Values and purpose
5)profit is definitely an added perk, if your company is making good profits then you can offer incentives such as bonuses or other things for your employees to do their best every day.
Secrets of selfridges
1)he had an approach to marketing he drew people in
2)he advertised in a newspaper he would fly the flag above the shop he wrote articles defending their cause
3. It made him popular with women shoppers when things turned violent people protected his store
4. He treated everyone the same this was revolutionary because the classes were separated so it was integrating the classes and treating them all the same even though that wasn’t everyone’s outlook on it
5. Sales became a worldwide tradition
This arrangement is ethical as long as the engineer signs and seals each design segment only after it has been reviewed by an independent consulting engineer who specializes in the field which it pertains.<span> If what she was dealing is not her field of expertise, she needs to have the aid of independent engineer who can verify the work passed to her before she signs the design segment.</span>