Add (2x+5) + (3-7) answer please

Mathematics
2 answers:
shusha [124]3 years ago
6 0
The answer is 2x+1.
Lapatulllka [165]3 years ago
3 0

Answer: 2x + 1

Step-by-step explanation:

You might be interested in
A gift box shown below is packed with small cubic 1/2 inch blocks. The blocks are packed tightly with no spaces between them.
svetlana [45]

Step-by-step explanation:

the box is

9 in × 3.5 in × 4.5 in = 141.75 in³

each block is

0.5 in × 0.5 in × 0.5 in = 0.125 in³ (1/8 in³)

so, we can fit

141.75 / 0.125 = 1134

blocks into the box.

and they fit neatly, as the dimensions of the box and the cubes allow a tight packing without any empty left over space in the box.

6 0
3 years ago
Humberto's hourly pay increased from $16.25 to $17.55. Find the percent increase.
JulijaS [17]

Answer:

8% Increase is the answer

8 0
3 years ago
The area of a square is equal to twice the perimeter of the square. Find the area of the square. 8 units2 64 units2 16 units2 32
Aloiza [94]
The answer is 249 square units
8 0
4 years ago
Read 2 more answers
An externally imposed project completion time sets the project duration at 75 days. The critical path of the project is establis
Katen [24]

Answer:

3 days

Step-by-step explanation:

This can be seen under Schedule management (Initiating)

Project float is simply the difference between the completion period externally imposed and the estimated time duration of the project (usually this is equal to the critical path length). The difference in this case is 0 because

Externally imposed project date = 75 days

Estimated duration of project = 75 days

Hence, a difference in these will be 0

However, a standard deviation of 3 days was giving (This implies that there is a +/- 3 days in the critical path from the estimated project duration) .

Hence the maximum float in this case will be 0 + 3 = 3 days

8 0
4 years ago
2(x - 4) = 8<br> Can someone help me?
Svetradugi [14.3K]
Distribute the 2
2x-8=8
Add 8 to both sides
2x=16
divide by two
x=8
5 0
3 years ago
Read 2 more answers
Other questions:
  • 1/3 (6p-3) + 1/7 (7p+14)<br><br>Show your work​
    7·2 answers
  • Harold worked 27 hours at a rate of $13.25 per hour. Which line in the table will help him calculate his income tax for this wee
    12·1 answer
  • Find a marginal Profit function if cost and revenue are given by c(x)=240+0.3x and r(x)=8x-0.06x^2
    13·1 answer
  • Liam is debating whether to use a straightedge and compass or a computer drawing program to complete a construction of a regular
    9·1 answer
  • The graph of y = e−x + 3 is shown. What are the y-intercept and the horizontal asymptote, and do they represent exponential grow
    15·1 answer
  • Need help with this question!
    15·1 answer
  • Amal can run 1/8 mile in 1 1/2 minutes how long would it take Amal to run 3 miles at that pace.
    12·2 answers
  • Describe an Constraint in math
    10·1 answer
  • Ivy bought a new pair of basketball shoes that were on sale for 25% off. If
    15·1 answer
  • .The figure below includes a semicircle and<br> trapezoid. Find the area of the figure.
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!