Answer:
The maximum value of the confidence interval for this set of survey results is 51.73%.
Step-by-step explanation:
A confidence interval has two bounds, a lower bound and an upper bound.
These bounds depend on the sample proportion and on the margin of error.
The lower bound is the sample proportion subtracted by the margin of error.
The upper bound is the margin of error added to the sample proportion.
In this question:
Sample proportion: 46.1%
Margin of error: 5.63%.
Maximum value is the upper bound:
46.1+5.63 = 51.73
The maximum value of the confidence interval for this set of survey results is 51.73%.
Answer:
The answer is Ari, Beth, Cindy
Explanation
Ari
- 2¾ miles is 2.75 miles
- speed of 2½ miles per hour is 2.5 mi/h
DISTANCE = SPEED × TIME
t = d/s
= 2.75/2.5
= 1.1hr
= 66mins
Beth
- 1¾ miles is 1.75 miles
- speed of 1¼ miles per hour is 1.25 mi/h
t = d/s
= 1.75/1.25
=1.4hr
=84mins
Cindy
(Correct me if i am wrong)
Seventy-three is the answer
The vertex would be at (3, 6).
25 sales. you start with 50 and get $2 per sale in that week. if you make 25 sales, 25*2= 50. then do 50+50=$100