Answer:
2/5 or 0.4
Step-by-step explanation:
:)
Answer:
Step-by-step explanation:
First, write an equation. 55x+40=190.
X represents the hours the electrician works. The 55 represents the $55 that she charges for each hour she works. The +40 for the $40 that was the price just to come to your house. The 190 is the total cost. Now, solve that equation.
55x+40=190
55x=150
x=2.72727272...
So the answer is 2.727 hours. It can be rounded as needed or turned into a decimal, 2 8/11.
Answer:
Step-by-step explanation:
Let assume that the volume = 88 cubic feet
Then:
The construction cost now is:

Now, to determine the minimum cost:
Now;
Answer:
1.6 cups
Step-by-step explanation:
Each batch needs 0.4 cups of sugar, and she is making 4 batches. Therefore, we can multiply 0.4 times 4 to find how much sugar is needed.
0.4*4=1.6
So, she needs 1.6 cups of sugar for 4 batches