1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
tester [92]
3 years ago
15

Compute the plantwide predetermined overhead rate. 2. During the year, Job 400 was started and completed. The following informat

ion was available with respect to this job: Direct materials $ 320 Direct labor cost $ 260 Machine-hours used 34 Compute the total manufacturing cost assigned to Job 400. 3. If Job 400 includes 60 units, what is the unit product cost for this job
Business
2 answers:
Goryan [66]3 years ago
7 0

Missing details in the question:

Taveras Corporation is currently operating at 50% of its available manufacturing capacity. It uses a job-order costing system with a plantwide predetermined overhead rate based on machine-hours. At the beginning of the year, the company made the following estimates:

Machine-hours required to support estimated production 165,000

Fixed manufacturing overhead cost $1,980,000

Variable manufacturing overhead cost per machine-hour $2.00

Answer:

1. Predetermined Overhead Rate = $14 per machine-hour

2. Total Manufacturing Cost =$1056

3.

Explanation:

1. Calculating the plantwide predetermined overhead rate.

First, we need to calculate the estimated total overhead

This is calculated using the following formula

E = F + VM

Where F =

M = Machine-hours = 165,000

F = Fixed manufacturing overhead cost = $1,980,000

V = Variable manufacturing overhead cost per machine-hour = $2.00

By Substituton;

E = $1,980,000 + $2.00 * 165,000

E = $1,980,000 + $330,000

E = $2,310,000

The Predetermined Overhead Rate, P = E/M

By Substitution

P =$2,310,000/165,000

P = $14 per machine-hour

Hence, the Predetermined Overhead Rate is $14 per machine-hour

2. Calculating the total manufacturing cost assigned to Job 400

3. If Job 400 includes 60 units, the unit product cost for this job is $17.6 per unit

Given

Direct materials $ 320

Direct labor cost $ 260

Machine-hours used 34

First, we need to calculate the overhead applied.

Overhead Applied = Machine-hour used * Overhead Rate

Overhead Applied = 34 * 14

Overhead Applied = $476

Total Manufacturing Cost = Direct materials + Direct labor cost + Overhead Applied.

Total Manufacturing Cost = $320 + $260 + $476

Total Manufacturing Cost =$1056

3. If Job 400 includes 60 units, the unit product cost for this job is calculated by

Total Manufacturing Cost ÷Total units for production

= $1056/60

= $17.6 per unit

Ksivusya [100]3 years ago
6 0

Answer:

(A) The plant wide predetermined overhead allocation rate cannot be calculated because the question is incomplete.

(B) Total Manufacturing Cost = $9,160

(C) Product Cost per Unit = $152.67

Explanation:

(A) Predetermined Overhead Rate = Total overhead cost ÷ Total machine hours

Input the data on Total Overhead Cost and calculate (as the data is absent in the question here)

Only machine hours is given.

(B) Total Manufacturing Cost = Direct Materials Cost + Direct Labour Cost + Manufacturing Overhead Cost

Since manufacturing overhead is absent, Total Manufacturing Cost is equal to

$320 + ($260 × 34hrs) = $320 + $8,840 = $9,160

(C) Product Cost per Unit = $9,160 ÷ 60 units

Product Cost per Unit = $152.67

You might be interested in
Estimating your expenses means ​
natka813 [3]
It Means you’re staying up-to-date on what you pay for and what leftover money you will have possibly?
3 0
4 years ago
Read 2 more answers
The sequencing of activities is often based upon dependencies between the activities. The dependencies that should guide activit
Varvara68 [4.7K]

Answer:

C

Explanation:

Mandatory or discretiinary

A mandatory dependency is one that must happen at a particular time. It is usually requirement of some kind based on contracts, laws, company procedures, physical limitations, etc. When the sequence of events is developed for various aspects of the process, mandatory dependencies are placed where they must happen.

A discretionary dependency is one that isn't based on a must, but on a should. These decisions are usually based upon best practices, business knowledge, preferences etc.When the sequence of events is developed they are placed where the team members would like them to occur

8 0
4 years ago
Heartbeat Industries has recently introduced a new production method that will make the production of their medical devices more
SCORPION-xisa [38]

Answer:

The correct answer is c. jumps to a steeper learning curve .

Explanation:

A steep learning curve means that in the face of a change in the production method, it is necessary to instruct the personnel that have direct and indirect incidence so that they are fully aware of how the change will be carried out in order to appropriate the new knowledge and launch it effectively. This process should have a series of phases, in which an effective development of the process is allowed in the shortest possible time.

4 0
3 years ago
Consider the monopolistically competitive market structure, which has some features of a competitive market and some features of
Vera_Pavlovna [14]

Answer:

The answer is below

Explanation:

Considering the available options, here are the attributes that characterize a competitive market, and a monopolistically competitive market.

A competitive market is characterized by Identical products and Price = MR, while Monopolistic competition is characterized by product differentiation and few sellers.

Hence, it can be written as:

Competitive markets

Product differentiation. No

Identical products Yes

Price=MR Yes

Few sellers No

Monopolistic competition

Product differentiation. Yes

Identical products No

Price=MR No

Few sellers Yes

8 0
3 years ago
A U.S. citizen works for a U.S. company in Germany. The income earned by the citizen increases U.S. GDP.
Firdavs [7]
It's false fudujdjjxuxidj
6 0
4 years ago
Other questions:
  • ______________ serves as a cross-functional enterprise backbone that integrates and automates many internal business processes a
    10·1 answer
  • Three factors contribute to spoiled meat after game is harvested. one of these factors is:
    7·1 answer
  • The order of the steps to prepare the worksheet are: A. complete the adjustments, prepare the adjusted trial balance, prepare th
    6·1 answer
  • Flat Economy is income that does not increase over time.
    11·1 answer
  • There are many perfumes on the market, but Demeter, a superior brand of perfume, has memorable scents that leads to emotional ti
    11·1 answer
  • Marcus is in seventh grade. He has decided that he wants to go to college when he graduates from high school. What are the best
    7·2 answers
  • Suppose that the price of good X rises from $12.00 to $12.90, and as a result the quantity demanded of good X falls from 5,000 u
    11·1 answer
  • Paano mag kopyahan Kaya tapos Yung sagot​
    10·1 answer
  • A skilled nursing facility chain is considering building a new facility on a piece of property that it currently owns. The prope
    8·1 answer
  • you may have observed that items such as different brands of aspirin, tomato sauce, or gasoline are typically priced the same as
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!