15

Compute the plantwide predetermined overhead rate. 2. During the year, Job 400 was started and completed. The following informat

ion was available with respect to this job: Direct materials $ 320 Direct labor cost $ 260 Machine-hours used 34 Compute the total manufacturing cost assigned to Job 400. 3. If Job 400 includes 60 units, what is the unit product cost for this job
Business
2 answers:
Goryan [66]3 years ago
7 0

Missing details in the question:

Taveras Corporation is currently operating at 50% of its available manufacturing capacity. It uses a job-order costing system with a plantwide predetermined overhead rate based on machine-hours. At the beginning of the year, the company made the following estimates:

Machine-hours required to support estimated production 165,000

Fixed manufacturing overhead cost $1,980,000

Variable manufacturing overhead cost per machine-hour $2.00

Answer:

1. Predetermined Overhead Rate = $14 per machine-hour

2. Total Manufacturing Cost =$1056

3.

Explanation:

1. Calculating the plantwide predetermined overhead rate.

First, we need to calculate the estimated total overhead

This is calculated using the following formula

E = F + VM

Where F =

M = Machine-hours = 165,000

F = Fixed manufacturing overhead cost = $1,980,000

V = Variable manufacturing overhead cost per machine-hour = $2.00

By Substituton;

E = $1,980,000 + $2.00 * 165,000

E = $1,980,000 + $330,000

E = $2,310,000

The Predetermined Overhead Rate, P = E/M

By Substitution

P =$2,310,000/165,000

P = $14 per machine-hour

Hence, the Predetermined Overhead Rate is $14 per machine-hour

2. Calculating the total manufacturing cost assigned to Job 400

3. If Job 400 includes 60 units, the unit product cost for this job is $17.6 per unit

Given

Direct materials $ 320

Direct labor cost $ 260

Machine-hours used 34

First, we need to calculate the overhead applied.

Overhead Applied = Machine-hour used * Overhead Rate

Overhead Applied = 34 * 14

Overhead Applied = $476

Total Manufacturing Cost = Direct materials + Direct labor cost + Overhead Applied.

Total Manufacturing Cost = $320 + $260 + $476

Total Manufacturing Cost =$1056

3. If Job 400 includes 60 units, the unit product cost for this job is calculated by

Total Manufacturing Cost ÷Total units for production

= $1056/60

= $17.6 per unit

Ksivusya [100]3 years ago
6 0

Answer:

(A) The plant wide predetermined overhead allocation rate cannot be calculated because the question is incomplete.

(B) Total Manufacturing Cost = $9,160

(C) Product Cost per Unit = $152.67

Explanation:

(A) Predetermined Overhead Rate = Total overhead cost ÷ Total machine hours

Input the data on Total Overhead Cost and calculate (as the data is absent in the question here)

Only machine hours is given.

(B) Total Manufacturing Cost = Direct Materials Cost + Direct Labour Cost + Manufacturing Overhead Cost

Since manufacturing overhead is absent, Total Manufacturing Cost is equal to

$320 + ($260 × 34hrs) = $320 + $8,840 = $9,160

(C) Product Cost per Unit = $9,160 ÷ 60 units

Product Cost per Unit = $152.67

You might be interested in
What is the term that describes a group of firms cooperating with each other in order to avoid competition?
Marrrta [24]
The right answer for the question that is being asked and shown above is that: "communication" the term that describes a group of firms cooperating with each other in order to avoid competition is that of <span>communication</span>
7 0
3 years ago
On January​ 1, Year​ 1, Gallagher Corporation issued 400 comma 000 stock options for 400 comma 000 shares to a division manager.
masha68 [24]

Answer:

$1,000,000

Explanation:

Gallagher Corporation

Stock option × Option estimated fair value /Numbers of years

Stock option $400,000

Option estimated fair value $10

Numbers of years 4

Hence:

($400,000 × $10) / 4 years

=$4,000,000/4years

= $1,000,000

Therefore pretax compensation expense for year 1 will be $1,000,000

4 0
3 years ago
An internship in high school will help you stand out from others when applying for colleges
zaharov [31]

I belive the answer would be B: True

7 0
4 years ago
Read 2 more answers
PLZ HELP ASAP !! Econ !!
alexandr402 [8]

I'm pretty sure B

Explanation:

I dont knowing I'm correct but give meh a rating if I'm right

7 0
3 years ago
The "ideal" business, according to Richard Buskirk of the University of Southern California:
Alexeev081 [22]

Richard Buskirk said that the ideal business would have no employees or minimal labor requirements. He said the business owners should do everything yourself, subcontract the rest, because this avoid benefits, labor hassles, government reporting.

He is advocating for a one-man show.

4 0
3 years ago
Other questions:
  • Jason has many roles in life. He is an engineering student in college, he's the oldest son in his family, and he earns extra mon
    8·1 answer
  • Novak Corp. has 7400 shares of 6%, $50 par value, cumulative preferred stock and 148000 shares of $1 par value common stock outs
    6·1 answer
  • You are the CEO of a company that has to choose between making a $100 million investment in either Russia or Poland. Both invest
    15·1 answer
  • Carmelita Inc., has the following information available: COST FROM BEGINNING INVENTORY direct materials $2,500 Conversion cost $
    14·1 answer
  • The Allowance for Bad Debts account had a balance of $6,300 at the beginning of the year and $8,100 at the end of the year. Duri
    11·1 answer
  • Asian Lamp Company manufactures lamps. The estimated number of lamp sales for the last three months for the current year are as
    8·1 answer
  • The price of a Honda Accord
    9·1 answer
  • A $150 debit to office equipment was entered in the account as a $150 credit. this error caused the trial balance to be out of b
    5·1 answer
  • In which condition is it an advantage when group incentives encourage competition between groups of employees?
    7·2 answers
  • unearned revenue, an operating liability, arises when a company receives cash before any goods are delivered or services are ren
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!