All members of our painting team paint at the same rate. If $8$ members can paint a specific wall in $36$ minutes, then how long would it take $18$ members to paint the same wall, in minutes?
1 answer:
Answer:
16 minutes
Step-by-step explanation:
Time is assumed to be inversely proportional to the number of members painting, so when the number of member is increased by a factor of 18/8, the time is expected to decrease by the factor 8/18 = 4/9.
(4/9)(36 min) = 16 min
18 members can paint the wall in 16 minutes .
You might be interested in
Sam kept his account open for 2 days.
Answer: what's ur question
Step-by-step explanation:
Answer:
Use shell method
And chose the cross section perpendicular to the x-axis
Determine the mode(s) of the data 2, 2, 2, 3, 5, 5, 6, 7, 8, 8, 8, 9, 10.
sergij07 [2.7K]
Answer:
all here
2,2,2, and 8,8,8,
Step-by-step explanation:
its the highest occurrence
Let the no of large frames bought be X Then the no of smaller frames bought will be (17 - X ) Cost incurred = 14X + 5( 17 - X) = 130 14X + 85 - 5X = 130 9X = 45
X = 5 Answer 5 large frames and 12 small frames Check 5X14 = 70 12X5 = 60 ADD = 130$