Answer:
At least 202.44 mm in the top 15%.
Step-by-step explanation:
When the distribution is normal, we use the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this question, we have that:

How many yearly mm of rainfall would there be in the top 15%?
At least X mm.
X is the 100-15 = 85th percentile, which is X when Z has a pvalue of 0.85. So X when Z = 1.037.




At least 202.44 mm in the top 15%.
Answer:
Heads: 5/8
Tails: 3/8
Step-by-step explanation:
The probability of getting tails is 375/1000 OR 3/8.
The probability of getting heads is 625/1000 OR 5/8.
Answer:
D. 423 miles
Step-by-step explanation:
75 miles(3 hours)
66 miles(3 hours)
225+198=423 miles
Answer:
11.11%
Step-by-step explanation:
The selling price is 250
The cost price is 250-25
= 225
Therefore the gain can be calculated as follows
=250-225x/225x×100
1/9 ×100
= 0.1111×100
= 11.11%
Hence the gain is 11.11%