Answer:
27
Step-by-step explanation:
3x3= 9 9x 3 = 27
Total= 27
if this is not right im sorry
If t is the total time in hours, 1 car takes 6hrs to assemble, and the number of cars assembled in t hours is y, then
y=t/6(remove any decimal if there )
All the best
Answer:
The number of vocalist sang on the end of the 10th day is 6138 vocalist.
Step-by-step explanation:
Given:
Number of vocalist needed on the first day = 6
Each day after that, the number of vocalists needed doubles
To Find:
The total number of vocalist found on the 10th day = ?
Solution:
By using the geometric series
Where
a is the first term
r is the ratio
n is the number of terms
On substituting the values
That is
The first day = 6 vocalist
Second day = 12 vocalist
third day =24 vocalist
Fourth day =48 vocal list
Fifth day = 96 vocalist
Sixth day = 192 vocalist
Seventh day = 384 vocalist
eight day = 768 vocalist
Ninth day = 1536 vocalist
Tenth day = 3072 vocalist
So
6+12+24+48+96+192+384+768+1536+3072 = 6138 vocalist sang in total on the end of tenth day.
6, -4, 2
You can get this by factoring the trinomial and setting each part, along with x-6, equal to 0. The trinomial can be factored to (x+4)(x-2)
Answer:
55%
Step-by-step explanation:
all you have to do is divide 114.4 by 208 to get 0.55, then turn that into a percentage by moving the decimal 2 times to the right.