Answer:
r<4
Step-by-step explanation:
-3(r-4)>0 step 1: distribute the -3
-3r+12>0 explain: -3 times r =-3r, -3 times -4 = 12
next, isolate the -3r by putting 12 on the other side
-3r+12>0 subtract 12 from both sides
-3r>-12 now, divide both sides by -3 (you have to flip the > because you are dividing by a negative) -12 divided by -3 is 4
so you should end up with r<4
Its -4/3
Thank You.
Pls mark Brainliest!
Answer:
35 :
t = 6.25 years
(about 6 years 3 months)
Equation:
t = (1/r)(A/P - 1)
Calculation:
First, converting R percent to r a decimal
r = R/100 = 4%/100 = 0.04 per year,
then, solving our equation
t = (1/0.04)((2500/2000) - 1) = 6.25
t = 6.25 years
The time required to get a total amount, principal plus interest, of $2,500.00 from simple interest on a principal of $2,000.00 at an interest rate of 4% per year is 6.25 years (about 6 years 3 months).
36:
The two distances are the same (out and back), so set them equal.
That is done by having a (rate)(time) equal a (rate)(time).
One time is “x” and the other is “4.8-x.”
One rate is 460 and the other is 500.
460 x = 500 (4.8 -x)
460 x = 2400 - 500x
900 x = 2400
x = 2.5 hours for the slower plane.
4.8- x = 2.3 hours for the faster plane.
Answer:
13 units
Step-by-step explanation:
So the length of those 2 points is 6+6 = 12.
The height would be 8-3 =5
Using pythagoras, you can find out the length of the line joining the 2 points so:

units
The answer is 2.8. or around there