Answer:
15
Step-by-step explanation:
PERT estimate is a measuring strategy that is based on a weighted average. It is used in measuring the uncertainty and risk via three estimates to determine an estimated likelihood for a project's cost or period of completion.
The formula is (O + 4M + P) ÷ 6
Where P is the most pessimistic = 29
M is the most likely = 12
O is the most optimistic = 10
Hence we have (10 + [4*12]+ 29) ÷ 6
= (10 + 48 + 29) ÷ 6
= 87÷6 = 14.5 ≈ 15
Rounded figure is equal to 15.
Hence the final answer to the question is 15
The equation would be y=1000(1.06)^x, plug a 3 in for x, and you get that the answer is D. $1191.02.
Answer:
Step-by-step explanation:
Let the speed of plane is p and speed of the wind is w.
<u>Then we have:</u>
- 10*(p + w) = 1120 ⇒ p + w = 112
- 20*(p - w) = 1120 ⇒ p - w = 56
<u>Sum the two equations and solve for p:</u>
- p + w + p - w = 112 + 56
- 2p = 168
- p = 84
<u>Find w:</u>
- 84 + w = 112
- w = 112 - 84
- w = 28
Because it is a square all sides are equal so all sides are 20.25 because half of 81 is 40.5 and half of that is 20.25.