Marlee will have 21.05 inches of wire left, here is why;
115-25.75=89.25
89.25+30=119.25
119.25-38=81.25
81.25-60.2=21.05
She has 21.05 inches of wire left.
You find the rates of each computer on its own...
One does the job in 55 minutes which we can say is 1/55
The other has a rate of 1/45.
The question wants to know how long it would take both working simultaneously to complete the job...
t/55+t/45=1
(9t+11t)/495=1
20t=495
t=24.75 minutes (24:15)
Answer:
im pretty sure its 1b 2a 3d 4c for the first row... if im reading it right. second row is 5c 6b 7a 8d i think. third row is 9b 10d 11a 12c. hope it helped :)
Step-by-step explanation:
i just plugged the functions into the y= in the calculator. i have the ti-84 plus ce calculator, but if you dont you can use one online
Answer:
Kindly check explanation
Step-by-step explanation:
Given that:
Equation of regression line : y^ = 60.7 + 0.139x
x = payroll (in millions of dollars) and y = number of wins for Major League Baseball teams in 2016.
From the general regression equation:
y = mx + c
Where m = slope of regression line.
The slope (m) of the equation given is 0.139
The slope could be interpreted as ; for every per unit change in y (every win a major league baseball team has in 2016), the payroll in million dollar increases by a product of 0.139