Answer:
21 weeks
Step-by-step explanation:
In this question, we are to use proportionality to find the solution to the question.
We were made to know that the time taken to build the highway is varied directly with the length and inversely with the number of workers.
Let us make a mathematical representation for this.
Let the time be t, number of workers be w and length be l
t is directly proportional to l and inversely proportional to w
Mathematically;
t = kl/w
Where k is the constant of proportionality.
Let’s find the value of k
150 workers built 12 miles of highway in 14 weeks ; plug these in the equation to get k
14 = k * 12/150
k = 150 * 14/12 = 175
Now we want to get t given w and l
from ;
t = kl/w
We can get t; where l = 15 and w = 125
t = 175 * 15/125
t = 21 weeks
If you multiply 10 by 4 that gets you the area, but you need to find the surface so multiply the product by 7 and that gets you the surface which is 280
Answer:
-19
Step-by-step explanation:
-11+(-8)
-11-8
-19
hole this is correct
Answer:The equation wth x in the information can be written as
1/2 x = 38.5 , Upon solving, the number = 77
Step-by-step explanation:
Let the number Sara was thinking about be x
halving the number to get an answer = 38.5 can be expressed as
1/2 X = 38.5
The equation with x in the information can be written as
1/2 x = 38.5
solving it becomes
1/2 x= 38.5
x = 38.5 x 2
x=77
The number Sara was thinking about = 77
The answer is : impossible