Answer:
Interrater reliability between the two data collectors was high
Step-by-step explanation:
Explanation-
- Interrater reliability is the consistency of observations between two or more observers.
- An Agreement of 54 out of 56 scores would indicate a high level of interrater reliability.
- The data collection method was appropriate for pressure ulcer risk assessment.
- The risk assessments did not have to be done by both evaluators at the same time.
Answer:
59.0
Step-by-step explanation:
Given a right angled triangle, ∆XYZ, to know which trigonometric ratio formula to apply in finding the measure of angle X, note the following:
Opposite side to angle X = 6
Hypotenuse = 7
Therefore, we would apply the following trigonometric ratio formula to solve for m<X:




(rounded to nearest tenth)
First you have to get the equation into slope/intercept format: y = mx + b

So the slope m = 2, and the y-intercept b = -1.
b tells you where the line intersects the y axis. The slope is rise (vertical distance) over run (horizontal distance). I have attached my best attempt at drawing this without graph paper. The dotted line represents the inequality, and the solution set includes the values above the line which is why it is shaded. Hope this helps!
Answer:
2 complex conjugates
Step-by-step explanation:
The discriminate is the part of the quadratic formula that is under the radical sign. If the discriminate is negative, that means that the solutions, both of them, are complex conjugates, aka imaginary solutions.
The first one is the correct answer due to 4 is the initial height of the plaint and 0.75 are inches that being added every week