1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Luden [163]
3 years ago
8

5 3/4 quarts = how many cups

Mathematics
1 answer:
SIZIF [17.4K]3 years ago
8 0

Answer:

23 cups

hope this helped

You might be interested in
ANSWER THIS ASAP DONT SEND A FILE AT ALL !! I NEED THE ANSWER QUICK!!
Finger [1]

Answer:

-5,3

Step-by-step explanation:

4 0
3 years ago
Read 2 more answers
How did the mongols defeat 75,00 russians if they only has about 25,00 soldiers?
mart [117]

the answer i got was 50,000


if its not right i can try to figure it out again

5 0
3 years ago
Will give brainliest please help <br><br>-5x+4-x-1​
Serjik [45]

Answer:

− 6 x  +  3

Step-by-step explanation:

hope that helps :)

3 0
2 years ago
A croissant shop produces two products: bear claws (B) and almond filled croissants (C). Each bear claw requires 6 oz of flour,
Kruka [31]

Answer:

letter A: B = 400; C = 1000; Max Z = $380

Step-by-step explanation:

bear claws (B) need 6 oz of flour (f), 1 oz of yeast (y), 2 ts of paste (p)

croissants (C) need 3 oz of flour (f), 1 oz of yeast (y), 4 ts of paste (p)

putting that information in equations, we have:

B = 6f + y + 2p

C = 3f + y + 4p

The total number of resources (R) are:

R = 6600f + 1400y + 4800p

Let's call M our total profit, "k1" the number of B produced and "k2" the number of C produced.

So, we can state that:

M = k1*0.2 + k2*0.3

The number of resources R2 will demand is calculated like this:

R2 = k1*B + k2*C = (6k1+3k2)f + (k1+k2)y + (2k1+4k2)p

using R2 and R, we can make some inequations:

6k1+3k2 <= 6600 -> 2k1+k2 <= 2200

k1+k2 <= 1400

2k1+4k2 <= 4800 -> k1+2k2 <= 2400

if we try to maximize k2 (as it worths more), we will have k1 = 0 and k2 = 1200 (limited by p), but looking at the resources R, we will still have resources to use (f and y). Looking at B and C expressions, we see that removing one C gives enough 'p' to make 2 B, which is a good trade (as 2B worths 0.4 cents, and 1C worths 0.3 cents). we have 200 'y' remaining, so doing this 200 times give us k1 = 400 and k2 = 1000, and the only resource remaining will be some of 'f'.

calculating the profit M, we have:

M = 400*0.2 + 1000*0.3 = 380$

the right answer is letter A.

3 0
3 years ago
Mrs. Solar is remodeling a house and is looking for a contractor to do the work. She is getting quotes from 3 different contract
andrezito [222]
#b. The equation y = 50x + 200 represents the total cost that the contractor will charge for x hours of work.
#c. (1, 250); (2, 300); (3, 350)
6 0
3 years ago
Other questions:
  • Find the equation of the line that passes through the pair of points(-1,-2),(-1,3)
    9·1 answer
  • How many triangles exist with the given angle measures? 32°, 51°, 97°
    5·1 answer
  • Is there enough information to conclude that the two triangles are congruent? If so, what is a correct congruence statement?
    7·2 answers
  • How many teaspoons are in 15 milliliters?<br><br> 1 tsp = 5 mL<br><br> 15 mL = ????
    5·2 answers
  • I need help with this pic (least to greatest )
    7·1 answer
  • I’m having a difficult time can y’all help me?!
    11·2 answers
  • What is the slope intercept equation for this graph someone answer the question pls
    9·1 answer
  • Use intercepts to graph the line described by the equation.<br><br> 2y = −10x − 20
    5·2 answers
  • Which two equations represent a nonlinear function?
    9·1 answer
  • Find the inverse of the function.<br> y=x+8
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!