<span>a = 36, b = 118, c = 62
----------------------------
</span>
The profit is going to be the total amount made, so you are going to subtract $350 - $45 = $305. $305. I hope this helps!
The degree of 2.
This is the definition of the quadratic function.
Answer:
1.74% probability that the commute takes more than 32 minutes.
Step-by-step explanation:
Problems of normally distributed samples can be solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

a.What is the probability that the commute takes more than 32 minutes?
This is 1 subtracted by the pvalue of Z when X = 32. So:



has a pvalue of 0.9826.
So there is a 1-0.9826 = 0.0174 = 1.74% probability that the commute takes more than 32 minutes.
Answer:(d): y=ax+b (a≠0); (d1)y=-4x+13
because of (d)⊥(d1) --> a.(-4)=-1 --> a=
(d): y=
+b. (d) pass through P(-1;-2) so we have
-2=(1/4).(-1)+b ---> b=
(d) y= 