1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
kramer
3 years ago
13

Please help me with maths !!!

Mathematics
1 answer:
zlopas [31]3 years ago
3 0

Answer:

  • 170.7 cm

Step-by-step explanation:

Let the original water level is x.

<u>Use below equation to find its value:</u>

  • x + 2.4 + 3 1/2 = 162 + 14.6
  • x + 2.4 + 3.5 = 176.6
  • x + 5.9 = 176.6
  • x = 176.6 - 5.9
  • x = 170.7 cm
You might be interested in
Please help me with this!! Thank you.
jolli1 [7]

tan                                  blue                                      gray

red                                      red                                     red

white                                       white                               white

6 outfits



3 0
3 years ago
Complete the coordinate proof of the theorem.
mojhsa [17]
C(a,b), because the x-coordinate( first coordinate) is a (seeing as it is situated directly above point B, which also has an x-coordinate of a) and the y-coordinate ( second coordinate) is b (seeing as it is situated on the same horizontal level as point D, which also has a y-coordinate of b)

the length of AC can be calculated with the theorem of Pythagoras:

length AB = a - 0 = a
length BC = b - 0 = b

seeing as the length of AC is the longest, it can be calculated by the following formula:

It is called "Pythagoras' Theorem" and can be written in one short equation:

a^2 + b^2 = c^2 (^ means to the power of by the way)

in this case, A and B are lengths AB and BC, so lenght AC can be calculated as the following:

a^2 + b^2 = (length AC)^2
length AC = √(a^2 + b^2)

Extra information: Seeing as the shape of the drawn lines is a rectangle, lines AC and BD have to be the same length, so BD is also √(a^2 + b^2). But that is also stated in the assignment!


3 0
3 years ago
Read 2 more answers
Which are the solutions of x2 = –7x – 8?
vovangra [49]

Answer:

The solutions are:

x_1=\frac{-7+\sqrt{17}}{2}     x_2=\frac{-7-\sqrt{17}}{2}

Step-by-step explanation:

We have the following quadratic equation

x^2 = -7x - 8

We can rewrite the equation as follows

x^2+7x + 8=0

Now we use the quadratic formula to solve the equation

For an equation of the form ax ^ 2 + bx + c = 0 the quadratic formula is:

x=\frac{-b\±\sqrt{b^2-4ac}}{2a}

In this case:

a=1,\ b=7,\ c=8

Then:

x=\frac{-7\±\sqrt{7^2-4(1)(8)}}{2(1)}

x=\frac{-7\±\sqrt{49-32}}{2}

x=\frac{-7\±\sqrt{17}}{2}

x_1=\frac{-7+\sqrt{17}}{2}

x_2=\frac{-7-\sqrt{17}}{2}

7 0
3 years ago
Read 2 more answers
the coefficient of correlation between x and y is 0.28 there covariance is 7.6 if the variance of x is 9 then standard division
Reptile [31]

Answer: 9.05

the answer is in here: https://brainly.in/question/13877695

Step-by-step explanation:

6 0
3 years ago
Problem 11-93 Waltner Corporation s management... Waltner Corporation's management reports that its average delivery cycle time
Marat540 [252]

Complete question is;

Waltner Corporation's management reports that its average delivery cycle time is 25 days, its average throughput time is 7.7 days, its manufacturing cycle efficiency (MCE) is 0.43, its average move time is 0.3 day, and its average queue time is 3.00 days. Required: a. What is the wait time?

b. What is the process time?

c. What is the inspection time?

Answer:

A) Wait time = 17.3 days

B) Process time = 3.311 days

C) Inspection time = 0.789 days

Step-by-step explanation:

A) we are given;

Delivery cycle time = 25 days

throughput time = 7.7 days

The formula for wait time is calculated from;

Delivery time = wait time + throughput time

So, wait time = Delivery time - throughput time

Wait time = 25 - 7.7 = 17.3 days

B) The process time is calculated from;

MCE = Process time/throughput time

So, process time = MCE x throughput time

We are given MCE = 0.43,thus, and we already know throughput time. Thus;

Process time = 0.43 x 7.7 = 3.311 days

C) The inspection time is gotten from;

throughput time = Process time + Inspection time + Move time + Queue time

Making inspection time the subject;

inspection time = throughput time - Process time - Move time - Queue time

Move time = 0.3 days

Queue time = 3 days.

Thus;

inspection time = 7.7 - 3.311 - 0.3 - 3.3 = 0.789 days

3 0
4 years ago
Other questions:
  • Please solve each inequality and show you work thank you so much:)
    8·2 answers
  • A shirt costs $7.97 including tax, and
    9·2 answers
  • Determine the solution set of (x - 4)2 = 12.
    10·1 answer
  • 30 Pts
    8·1 answer
  • Help please with this question
    15·1 answer
  • The aorta is the largest artery in the human body. In the average adult, the aorta attains a maximum diameter of about 1.18 inch
    8·1 answer
  • Please help and dont get it wrong! thank you =)))
    6·1 answer
  • Identify the graphed linear equation.<br> A) y=5x+2<br> B) y=5x-2<br> C) y=-5x+2<br> D) y=-5x-2
    6·1 answer
  • -2(7x - 5) <br> i've done everything i could , i hate new math help
    6·2 answers
  • Is 0.706 greater then 1? Explain
    7·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!