Answer:
2/21
Step-by-step explanation:
The question is badly formatted so cannot match the answer choice
Total number of tiles = 4 + 5 + 6 = 15
P(A) = P(drawing a black tile from 15 tiles) = 4/15
After event A, there are 14 tiles left : 3 black, + 5 white + 6 blue
P(B/A) = P(drawing white tile after a black tile has been drawn) = 5/14
P(A and B) = P(A).P(B/A) = 4/15 x 5/14 = 2/21
Note that P(B) = 5/15 since we are talking about independently drawing a white tile from the original stack of tiles
Answer:
4
Step-by-step explanation:
Answer:
i cant read spanish. sorry
Step-by-step explanation:
3,989.237
A thousandth = 1/1000 = 0.001
Round 4th decimal place = 5
5 and over is rounding up and under 5 rounds down so it would be 3,989.237
Answer:
Read step by step explanation
Step-by-step explanation:
The owner already knows that the limit for the average time delivered pizzas is 38 minutes. So we conclude
1.-The resulting mean from sample data ( x ) ( 27 customers) need to be smaller than 38 minutes, any value of sample above 38 minutes means more time for the delivery action and will indicate a failure for the future project
2.-As sample size is smaller than 30 the test has to be t-student one tail test to the left
Test hypothesis
Null hypothesis H₀ x = 38
Alternative hypothesis Hₐ x < 38
We should test at a significance level α = 0,05 (α = 5%)
If the result of the test is to accept H₀ delivery project won´t be implemented, if on the other hand, H₀ is rejected then in the condition of the alternative hypothesis we accept Hₐ the sample indicates that we have a smaller average time than 38 minutes.