Time taken to fill the bathtub is 8 min
time taken to drain the bathtub is 12 min
fraction of bathtub filled in 1 hour=1/8
fraction of bathtub drained in 1 hour=1/12
fraction that will be filled in a minute given that both taps are opened at he same time:
1/8-1/12
=1/24
thus time taken for the bathtub to be filled is 24 min
Answer:
14 in^2
Step-by-step explanation:
Answer:
Step-by-step explanation:
I’m not too good with this but the answer should be 87.5
Answer:

Step-by-step explanation:
Point slope form is: 

We are given the slope of
and the point of (8,4).
Replace 'm' with -5/6, 'x1' with 8, and 'y1' with 4.

I do not see any options that match this, but the boxed equation should the correct answer.
Answer:
8000000000000000000000000000000000