Answer:
B. customer relationship management
NEC arose to:
d.standardize equipment use as a marketing tool
Explanation:
NEC Corporation is a multinational IT and Electronics firm that is based out of Japan.
It was started in the 60s as Nippon Electric company ltd. but it re branded itself to name NEC in 1983.
It is responsible for the standardization of equipment as their USP and their prime marketing tool and made it a standard industry practice to do so as of now.
Their impact on the whole industry has been immense.
Answer:
the company should buy and install the press because the NPV of the project is positive ($73,133.75)
Explanation:
the MACRS 5 year depreciation:
- $375,000 x 20% = $75,000
- $375,000 x 32% = $120,000
- $375,000 x 19.2% = $72,000
- $375,000 x 11.52% = $43,200
- $19,800, since salvage value at year 5 is $45,000
- $0 x 5.76% = $0
salvage value $45,000
total initial investment = $375,000, discount rate = 11%
- cash flow year 1 = {($142,000 - $15,000 - $75,000) x (1 - 34%)} + $75,000 = $109,320
- cash flow year 2 = {($142,000 - $2,000 - $120,000) x (1 - 34%)} + $120,000 = $133,200
- cash flow year 3 = {($142,000 - $2,000 - $72,000) x (1 - 34%)} + $72,000 = $116,880
- cash flow year 4 = {($142,000 - $2,000 - $43,200) x (1 - 34%)} + $43,200 = $107,088
- cash flow year 5 = {($142,000 - $2,000 - $19,800) x (1 - 34%)} + $19,800 + $45,000 = $144,132
the NPV of the project = -$375,000 + $109,320/1.11 + $133,200/1.11² + $116,880/1.11³ + $107,088/1.11⁴ + $144,132/1.11⁵ = $73,133.75
Answer:
C. hjivgjbvhmmhxtvjjcgjbchvcfvbjjcfsagkbfccfc
Answer:
Manufacturing overhead volume variance= $1,200 unfavorable
Explanation:
<u>First, we need to calculate the predetermined overhead rate:</u>
<u></u>
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Fixed Predetermined manufacturing overhead rate= 1,200,000/240,000
Fixed Predetermined manufacturing overhead rate= $5 per machine hour
<u>Now, to calculate the fixed manufacturing overhead volume variance, we need to use the following formula:</u>
<u></u>
Manufacturing overhead volume variance = Actual Factory Overhead - Budgeted Allowance Based on Standard Hours
Manufacturing overhead volume variance= (101,200) - (5*20,000)
Manufacturing overhead volume variance= $1,200 unfavorable