Answer:
1/9
Step-by-step explanation:
h1 = 9
h2 = h1 × 1/9 = 9 × 1/9 = 1
h3 = h2 × 1/9 = 1 × 1/9 = 1/9
Answer:
mZB= 74
Step-by-step explanation:
ZB+ZA=180
3X-23+2X-12=180
5X-35=180
5X=180+35
5X=215 (then divide both sides by 5 to x be left alone.)
X=43....so ZB=2(43)-12
=86-12=74
Do you have the measurements for the question?
<span />
Answer:
x=6
Step-by-step explanation:
7x+12=9x
simplify
subtract 7x from both sides
12=2x
divide both sides by 2
x=6
Answer:
M(B(h))=78.18025h
Step-by-step explanation:
First we have the following equations:
L(h) = 28.75h eq. 1
B(L) = 1.78L eq. 2
M(B) = 1.43B eq. 3
To find the selling price based on the estimated number of hours, we need to start replacing equation 1 in equation 2 as:
B(L) = 1.78*B
B(L(h)) = 1.78*(28.75h)
B(L(h)) = B(h) = 51.175h eq. 4
Finally, if we weplace equation 4 in equation 3, we get:
M(B) = 1.43B
M(B(h)) = 1.43*(51.175h)
M(B(h)) = 73.18025h
So, the composite function that can be used to find the selling price for the labor portion of a bid based on the estimated number of hours is:
M(B(h)) = 73.18025h