1.92/4 then you take that which is .48 and do .48/16 to get .03
Answer:
The answer is 18
Step-by-step explanation:
Step-by-step explanation:
The ratio of the perimeters = the scale
P₂ / P₁ = 6 / 4 = 3 / 2
The ratio of the areas = the square of the scale
A₂ / A₁ = (6 / 4)² = (3 / 2)² = 9 / 4
Same for the triangles:
P₂ / P₁ = 6 / 3 = 2
A₂ / A₁ = (6 / 3)² = (2)² = 4
Answer:
$25.51
Step-by-step explanation:
To find the total cost, we need to multiply the amount per yard by the amount of yards of material used.
We have 4.75 yards of material and it costs 5.37 for every yard. All we have to do now is multiply them together.
5.37*4.75=25.51 rounded up.
Hope this helps!