Answer:
A. 14.6 ± 7.00
Step-by-step explanation:
Formula for the confidence interval between the two mean is;
CI = (μ2 - μ1) ± z√[((s1)²/n1) + ((s2)²/n2)]
We are given;
μ1 = 94.5
μ2 = 109.1
s1 = 10
s2 = 9
n1 = 10
n2 = 10
The z-value at confidence interval of 90% is 1.645
Thus;
CI = (109.1 - 94.5) ± 1.645√[(10²/10) + (9²/10)]
CI = 14.6 ± 7.00
Answer:
The answer to your question is below
Step-by-step explanation:
Data
Mayor axis vertical = 14
Minor axis = 10
Center = (-7, 3)
Formula
Mayor axis = 2a
Minor axis = 2b

Process
2a = 14 2b = 10
a = 7 b = 5
h = -7 k = 3
Substitution

<u>Answer:</u>
The height of the tower nearby the pole is 102 m.
<u>Solution:</u>
Given,
Height of the pole = 3.5 m
Length of the shadow of the pole = 1.47 m
Length of the shadow of the tower nearby = 42.75 m
Let us assume the height of the tower as x


On solving for x we get,


On rounding off to the nearest meter we get,
x=102 m
The height of the tower is 102 meter.
Carla is correct because they will not all be exactly the same unless they choose to make them all be the same. Hope I could help! :D
Answer:
See attached
Step-by-step explanation:
The graph of a <u>proportional linear relationship</u> is a line that <u>passes through the origin</u> (0, 0).
From inspection of the given tables, the <u>linear equations</u> for each table of points is:
- Table 1: y = x + 1
- Table 2: y = x/2
- Table 3: y = x + 2
- Table 4: y = 2x + 1
The only equation for which y = 0 when x = 0 is y = x/2 → Table 2.
Given points from Table 2:
To <u>graph the line</u>, plot the given points and draw a line through them (see attached).