1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
hichkok12 [17]
2 years ago
13

Solve For x Help pleaassee

Mathematics
2 answers:
Mkey [24]2 years ago
6 0

Answer:

x=4

Step-by-step explanation:

C+E=180

14x-8+132=180

14x=180-132+8

14x=56

x=4

serg [7]2 years ago
3 0

Answer:

10°

Step-by-step explanation:

132° = (14x - 8)°

140° = 14x

× = 10°

You might be interested in
The perimeter of the triangle
Illusion [34]
Area=228 feet sqa.
Length=12 ft.
Breadth=(228/12) ft.
=19 ft.
Perimeter=2(12+19) ft.
=2×31 ft.
=62 ft.

HOPE IT HELPS UH!!☺️☺️
8 0
3 years ago
What line intersect to make a right angle
bazaltina [42]

2 lines intersect at one point and stop there to form an L shaped angle they also form a square when you combine another right angle and they measure 90 degrees. Hope this helps!

3 0
3 years ago
What is two the two <br><br><br><br> this is Free poin ]t because I'm nice
satela [25.4K]

Two the two is the four.

4 0
2 years ago
Before changes to its management staff, an automobile assembly line operation had a scheduled mean completion time of minutes. T
Sergio [31]

No, we don't have evidence to support that the mean completion time under new management has decreased but we can conclude that it remains at 15.5 minutes.

Given mean of 15.5 minutes , standard deviation of 1.7 minutes, sample size of 90 and sample mean of 15.4 minutes.

We can do the following study for conclusion:

Firstly the null hypothesis is

H_{0}: x=15.5

The alternate hypothesis is

H_{1}: x < 15.5

since the value is less than this is a one tailed test.

Z=x bar-x/d/\sqrt{n}

where x is sample mean and d is standard deviation.

Z=15.4-15.5/1.7/\sqrt{90}

=-0.1/1.7/9.4868

=-0.560

Critical value of Z at 0.1 level of significance

Z=-1.28

We fails to reject the null hypothesis since -0.560>-1,28

Hence we don't have evidence to support that the mean completion time under new management has decreased but we can conclude that it remains at 15.5 minutes.

Learn more about hypothesis at brainly.com/question/11555274

#SPJ4

Question is incomplete. It should include:

mean of 15.5 minutes ,

standard deviation of 1.7 minutes,

sample size of 90

and sample mean of 15.4 minutes.

5 0
1 year ago
PLEASE HELP AS SOON AS POSSIBLE! Please look at the attached image, I greatly appreciate it!
lukranit [14]

Answer:

x^2 = 10^2 - 9^2

x^2 = 100 -81 = 19

x = 4.3588989435

The triangle sides are 10, 9 and 4.3588989435

Step-by-step explanation:

6 0
2 years ago
Other questions:
  • What is the slope of the line passing through (-3,5) and (5,-3)
    15·1 answer
  • Which of the following is an arithmetic sequence?
    8·1 answer
  • In a triangle ABC, if &lt;B = 60° and the ratio of two sides is a: c= 2: square root 3+1, then &lt;A=
    13·1 answer
  • A bag contains 3 green, 4 blue, 2 red, 1 black, 6 yellow and 4 brown marbles. Suppose you randomly select a marble, replace it i
    7·1 answer
  • I really need help i will rate you branliest
    9·1 answer
  • What is the Volume PLEASE HELP!!!!
    7·1 answer
  • Pls help it’s urgent I need help I’m begging u have a good day pls help will give Brainlist
    10·1 answer
  • College roommates John and David were driving home to the same town for the holidays. John drove 55mph, and David, who left an h
    14·1 answer
  • Need help on worksheet
    6·2 answers
  • I need help what's the correct answer
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!