Part a)
It was given that 3% of patients gained weight as a side effect.
This means


The mean is


The standard deviation is



We want to find the probability that exactly 24 patients will gain weight as side effect.
P(X=24)
We apply the Continuity Correction Factor(CCF)
P(24-0.5<X<24+0.5)=P(23.5<X<24.5)
We convert to z-scores.

Part b) We want to find the probability that 24 or fewer patients will gain weight as a side effect.
P(X≤24)
We apply the continuity correction factor to get;
P(X<24+0.5)=P(X<24.5)
We convert to z-scores to get:

Part c)
We want to find the probability that
11 or more patients will gain weight as a side effect.
P(X≥11)
Apply correction factor to get:
P(X>11-0.5)=P(X>10.5)
We convert to z-scores:


Part d)
We want to find the probability that:
between 24 and 28, inclusive, will gain weight as a side effect.
P(24≤X≤28)=
P(23.5≤X≤28.5)
Convert to z-scores:

The total number of cars rented for the first 5 months is
8 + 16 + 32 + 64 + 128 = 248
Answer: 275$
I'm not entirely sure I did this right! But at least try!!!
Step-by-step explanation:
20/100 = 55/x (cross multiply)
20x = 5,500 (divide)
X = 275
Answer:
The answer is c
Step-by-step explanation:
Well, since the Circle is 8cm you can divide the circle by two to get 4
A1 = 35x+25
Good guys = 40x
35x+25 = 40x
subtract 3x x from each side
25 = 5x
divide each side by 5
x = 25/5 = 5
so 5 hours they would be the same cost, anything over 5 hours and A1 would be better
so X>5 for A1 to be the better price