Given the amount of water needed to fill the cement dam and the water pump rate, the time needed to fill the dam is 400 minutes or 6hours 40minutes.
Option B)6h 40min is the correct answer.
<h3>How long does it take to fill the dam?</h3>
Given that;
- Amount of water needed to fill the dam A = 30000 litres
- Pump rate r = 75 litres per minute
- Time needed to fill the dam T = ?
To determine how long it take to fill the dam, we say;
Time need = Amount of water needed ÷ Pump rate
T = A ÷ r
T = 30000 litres ÷ 75 litres/minute
T = 400 minutes
Note that; 60min = 1hrs
Hence,
T = 6hours 40minutes
Given the amount of water needed to fill the cement dam and the water pump rate, the time needed to fill the dam is 400 minutes or 6hours 40minutes.
Option B)6h 40min is the correct answer.
Learn more word problems here: brainly.com/question/2610134
#SPJ1
Answer:
the answer is A since it forms a pattern :>
Answer:
all real numbers
Step-by-step explanation:
The function f(x) = 3|x +4| +1 is defined for all values of x. Its domain is <em>all real numbers</em>.
Answer:
Is Linear
Step-by-step explanation:
Because The number said that
Try this:
1. if to increase by 3.5%, then 16470.45 is 100% and new number is 103.5%; it means 1.035 times;
2. according to the previous issue result is 16470.45*1.035=17046.91575.
answer: 17046.91575