YOU COULD POTTENTIALLY HAVE TO WIPE ALL CURRENT FILES CLEAN OR U MAY HAVE TO PAY FOR CERTAIN PROGRAMS
Answer:
/*
Find Largest and Smallest Number in an Array Example
This Java Example shows how to find largest and smallest number in an
array.
*/
public class FindLargestSmallestNumber {
public static void main(String[] args) {
//array of 10 numbers
int numbers[] = new int[]{32,43,53,54,32,65,63,98,43,23};
//assign first element of an array to largest and smallest
int smallest = numbers[0];
int largetst = numbers[0];
for(int i=1; i< numbers.length; i++)
{
if(numbers[i] > largetst)
largetst = numbers[i];
else if (numbers[i] < smallest)
smallest = numbers[i];
}
System.out.println("Largest Number is : " + largetst);
System.out.println("Smallest Number is : " + smallest);
}
}
/*
Output of this program would be
Largest Number is : 98
Smallest Number is : 23
*/
Explanation:
Explanation:
Pre-production formally begins once a project has been greenlit. At this stage, finalizing preparations for production go into effect. Financing will generally be confirmed and many of the key elements such as principal cast members, director and cinematographer are set. By the end of pre-production, the screenplay is usually finalized and satisfactory to all the financiers and other stakeholders.
During pre-production, the script is broken down into individual scenes with storyboards and all the locations, props, cast members, costumes, special effects and visual effects are identified. An extremely detailed shooting schedule is produced and arrangements are made for the necessary elements to be available to the film-makers at the appropriate times. Sets are constructed, the crew is hired, financial arrangements are put in place and a start date for the beginning of principal photography is set. At some point in pre-production, there will be a read-through of the script which is usually attended by all cast members with speaking parts, the director, all heads of departments, financiers, producers, and publicists.