To answer this question, an assumption must be made, that Eva spends 8 hours a day working. If this is the case, then Eva will complete jobs w, x, and v on day one, for a total of six hours. Since the next job (y) requires 4 hours, she will spend two hours working that day, leaving 2 more hours to go on that job. The next day she will spend 2 hours finishing job y, completing it, and finish the longest job z (hours) that day. This means she had 4 jobs on day one, and 2 jobs on day 2 for and average of 3 jobs per day.
This answer assumes an 8 hour work day, and that Eva can start a job she cannot finish that day.
A rectangle, presumably, as the cross section is going to be whatever shape the outward faces are (in the case of a vertical cross section like this one)
Answer:
80 m^2
Step-by-step explanation:
The given information lets you write two equations involving length (x) and width (y).
- 2(x +y) = 36 . . . . the perimeter is 36 m
- (x+1)(y+2) -xy = 30 . . . . increasing the length and width increases area
The second of these equations simplifies to another linear equation, giving a system of linear equations easily solved.
xy +y +2x + 2 -xy = 30
2x +y = 28 . . . . . . . subtract 2
Dividing the first equation by 2 gives
x +y = 18
and subtracting this from the above equation gives ...
(2x +y) -(x +y) = 28 -18
x = 10
Then
y = 18 -10 = 8
The area of the original rectangle is xy = 10·8 = 80 m^2.
Simply using the given formula ,
I = P × R × t
I = 100 × 10/100 × 3
I = $30