Operational risk management is a continual cylic process that involves assessment of risk, risk decision making and execution of risk controls. it is a five step process and it is often used in planning. the five steps include identifying the hazard. hazard is anything with the potential of causing harm. the second step is assessment of hazard. this is followed by making risk decisions and fourth step execution of risk controls and finally supervision.
<span>A seatbelt should be fastened so as to run diagonally across the chest and to fit low and tight across the waist. This ensures that, during the rapid deceleration experienced during a crash, the seatbelt will perform the intended function, that is, to keep the passenger in place within the vehicle.</span>
Because people may make fun of you or call you some terrible things because stds are often linked by sleeping around (obvi not always true but that’s what people make it out to be)
and i’m good lol you?
Answer: The Answer Would Be D
Explanation:
bottleneck effect --- > A disease wipes out almost 90% of a population of birds, but the species adapts, and after 5 years its numbers increase dramatically.
gene flow ---> A population of rats travels on a cargo ship and mate with rats in a new region.
founder effect ---> Biologists introduce a small population of lizards on an island as part of a conservation effort.
mutation ---> A change in a DNA sequence causes a lizard to develop a darker skin color, which helps it hide from predators.