1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
erma4kov [3.2K]
3 years ago
7

10. What is the length of s? I 450

Mathematics
1 answer:
dimulka [17.4K]3 years ago
4 0
450 it is trust me hehdjxgjsbdjdjdvbbjdv
You might be interested in
Is it A,B,C,or D? Please Help <br><br> MATH
GuDViN [60]

Answer:

the last one you have attached

Step-by-step explanation:

8 0
3 years ago
Read 2 more answers
11) The sum of two numbers is 25. The difference of two numbers is 3.
kupik [55]

Answer:

11) 14 and 11

Step-by-step explanation:

i can't help in number 12 , sorry !

5 0
4 years ago
What is the greatest common factor of 35y4, 14y4, and 63y4?
kvv77 [185]

Answer:

7y4

Step-by-step explanation:

7 is the highest number that can go into all three numbers

7 0
4 years ago
A company is producing a new product. Due to the nature of the​ product, the time required to produce each unit decreases as wor
balu736 [363]

Answer:

The total time to produce units 1 through 10 = 21.762 hours

The total time to produce units 30 through 40 = 22.187 hours

Step-by-step explanation:

Function for the learning process is T(x) = 2 + 0.6(1/x)

Time required to produce 1st unit = 2.6

Time required to produce 2nd unit = 2.3

Time required to produce 3rd unit = 2.2

Time required to produce 4th unit = 2.15

Time required to produce 5th unit = 2.12

Time required to produce 6th unit = 2.1

Time required to produce 7th unit = 2.09

Time required to produce 8th unit = 2.075

Time required to produce 9th unit = 2. 067

Time required to produce 10th unit = 2. 06

The total time required for a new worker to produce units 1 through 10 is the sum of the above times. The total time to produce units 1 through 10 = 21.762

Function for the learning process is T(x) = 2 + 0.6(1/x)

Time required to produce 30th unit = 2.02

Time required to produce 31st unit = 2.019

Time required to produce 32nd unit = 2.0188

Time required to produce 33rd unit = 2.018

Time required to produce 34th unit = 2.0176

Time required to produce 35th unit = 2.017

Time required to produce 36th unit = 2.0167

Time required to produce 37th unit = 2.016

Time required to produce 38th unit = 2.0158

Time required to produce 39th unit = 2. 0154

Time required to produce 40th unit = 2. 015

The total time required for a new worker to produce units 30 through 40 is the sum of the above times. The total time to produce units 30 through 40 = 22.187

7 0
3 years ago
PLEASE HELP DEW IN 1 hour
Marta_Voda [28]

Answer: B

Step-by-step explanation:

2(—2) + 10 = 6.

2(0) + 6 = 6.

2(2) + 2 = 6.

2(4) + (—2) = 6

5 0
3 years ago
Other questions:
  • I really need help with this, my teacher doesn't really teach and I'm stumped again.​
    6·1 answer
  • Two numbers have a sum of 1212 and a difference of 518 what are are the two numbers
    5·2 answers
  • Twio angels that form a right angel are supplementary
    8·2 answers
  • Which statement about the graphs of f(x)=4x+2 and g(x)=8x+4 is correct?
    15·2 answers
  • 10. Find the real-number root. 3√0.001
    13·2 answers
  • In Mr. Klein’s class
    5·1 answer
  • Triangle CDA is the image of triangle ABC after a 180 rotation around the midpoint of segment AC. Triangle ECB is the image of t
    8·1 answer
  • I need help with this problem ASAP
    8·1 answer
  • At a high-end restaurant, a meal with a 22% tip costs $179.11. What was the original cost of the meal?
    14·2 answers
  • The table shows the location of different animals compared to sea level. Determine if each statement is true or false.
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!