1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
denis23 [38]
3 years ago
8

A company is producing a new product. Due to the nature of the​ product, the time required to produce each unit decreases as wor

kers become more familiar with the production procedure. It is determined that the function for the learning process is Upper T (x )equals 2 plus 0.6 (StartFraction 1 Over x EndFraction )​, where Upper T (x )is the​ time, in​ hours, required to produce the xth unit. Find the total time required for a new worker to produce units 1 through 10​; units 30 through 40.
Mathematics
1 answer:
balu736 [363]3 years ago
7 0

Answer:

The total time to produce units 1 through 10 = 21.762 hours

The total time to produce units 30 through 40 = 22.187 hours

Step-by-step explanation:

Function for the learning process is T(x) = 2 + 0.6(1/x)

Time required to produce 1st unit = 2.6

Time required to produce 2nd unit = 2.3

Time required to produce 3rd unit = 2.2

Time required to produce 4th unit = 2.15

Time required to produce 5th unit = 2.12

Time required to produce 6th unit = 2.1

Time required to produce 7th unit = 2.09

Time required to produce 8th unit = 2.075

Time required to produce 9th unit = 2. 067

Time required to produce 10th unit = 2. 06

The total time required for a new worker to produce units 1 through 10 is the sum of the above times. The total time to produce units 1 through 10 = 21.762

Function for the learning process is T(x) = 2 + 0.6(1/x)

Time required to produce 30th unit = 2.02

Time required to produce 31st unit = 2.019

Time required to produce 32nd unit = 2.0188

Time required to produce 33rd unit = 2.018

Time required to produce 34th unit = 2.0176

Time required to produce 35th unit = 2.017

Time required to produce 36th unit = 2.0167

Time required to produce 37th unit = 2.016

Time required to produce 38th unit = 2.0158

Time required to produce 39th unit = 2. 0154

Time required to produce 40th unit = 2. 015

The total time required for a new worker to produce units 30 through 40 is the sum of the above times. The total time to produce units 30 through 40 = 22.187

You might be interested in
Determine if the following relation is a function or not
Darya [45]
1 is not. 2 is. 3 is not. 4 is. 5 is. 6 is. 7 is not. 8 is.
7 0
3 years ago
Wade borrowed $12,500 from his uncle at 4.5% simple interest to use for travel and repaid the loan in 4 years. How much did he p
natali 33 [55]
12,500 / 100 = 125    125 x 4.5 = 562.5      562.5 x 4 = 2250
2250 + 12,500 = 14,750       He paid back a total of $14,750. Hope this helps :)
7 0
3 years ago
Can I get help please someone
Kamila [148]

Answer:

Step-by-step explanation:

Im pretty sure its A

4 0
3 years ago
Read 2 more answers
What is the circumference of a circle with weight of 3 1/8 inches?
MrRissso [65]
A circle can’t weigh any inches just gonna say that now. Assuming you meant “height” of 3.125 inches, then the circumference is C=2(pi)r, where r is 1/2 the height (radius is half of the diameter, this situation the diameter being 3.125 inches.

Circumference would be approximately 9.8174770424681 inches—
Or shortened to 2 decimals it’s approximately
9.82 inches
Or approximately
9.8 inches
Or approximately
10 inches
6 0
3 years ago
Positive numbers are located to the right of zero on the number line.<br><br><br> True False
Trava [24]

\text {Hi!}

\text {The Answer to this Problem Is:}

\fbox {True!}

\text {When we look at a number line with positive and negative numbers we see} \text {that positives are to the right and negatives are to the left.}

\text {As you can see the number line on the image that all} \text {the negative numbers are to the left and positive numbers are to the right.}

\text {\underline {Remember}}

\text {Positive to the Right.}

\text {Negative to the Left.}

\text {Best of Luck!}

7 0
3 years ago
Read 2 more answers
Other questions:
  • V = 5x + 2y<br> X = 3<br> y = -4<br> a) Work out the value of V.
    15·2 answers
  • What did the boy bumper car say to the girl bumper car
    9·1 answer
  • How do I write 2\5, 1.4, 1\3, and 0.5 from least to greatest?
    11·2 answers
  • Which expression is not equal to 30?
    6·2 answers
  • Nationwide, it is estimated that 40% of service stations have gas storage tanks that leak to some extent. California is trying t
    15·1 answer
  • Two friends are collecting stuffed animals. Veronica has 5 more than double the number of stutted
    6·1 answer
  • A bag contains white marbles and green marbles, 62 in total. The number of white marbles is 3 less than 4 times the number of gr
    11·1 answer
  • <img src="https://tex.z-dn.net/?f=%20%5Cfrac%7B2%7D%7B10%7D%20%3D%20%20%5Cfrac%7B4%7D%7Ba-3%7D" id="TexFormula1" title=" \frac{2
    9·1 answer
  • Select the statement(s) that accurately describes the nature of an angle in standard position. (Select all that apply.) A)Two or
    9·1 answer
  • Solve the system of equations y=5x-1 y=9x-9
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!