Answer:
After 200 students, it would better to hire Band A
Step-by-step explanation:
350+ 1.25x = 600
1.25x = 250
x = 200
at 200 students the cost is the same for Band A and Band B
at 201 students Band A will be cheaper then Band B
Sq rt of 8464= 92
sq rt of 29584= 172
sq rt of 15376= 124
sq rt of 10816 = 104
sq rt of 21904 = 148
sq rt of 44100= 210
We call these perfect squares.
34.90 is the answer ♡♡
sorry typed the wrong number.
I've got it down to m+n=m*n but that doesn't seem to help. I'm still working