First off.. we need to get the units the same. All in hours,
or all in minutes. 36 minutes = 36/60 hours = 3/5 hours = 0.6 hours.
12 minutes = 12/60 hours = 1/5 hours = 0.2 hours
Set up a proportion:
0.2 is to 0.6 as x is to 22.5
x/22.5 = 0.2/0.6
x = 0.2(22.5)/0.6
x = 7.5 hours
thanx
heyaaaaa
Answer:
5
Step-by-step explanation:
The slope is 5 because the equation is y = 200-5x where 5 is the slope because it is the rate of change.
Answer:
The Possible dimension of the ring could be;
20 ft × 60 ft
25 ft × 48 ft
30 ft × 40 ft
60 ft × 20 ft
48 ft × 25 ft
40 ft × 30 ft
Step-by-step explanation:
Given:
Number of skaters = 30
Area for each skater = 40 sq ft
We need to find the dimension of rectangular ring the are going to build.
Now we know that they building the skating ring such that they all can use at same time.
Hence if the all use at same time then we will find the total area first.
Total area can be calculated by multiplying Number of skaters with area required for each skaters.
Framing the equation we get;
Total area = 
Hence The total area of the rectangular ring would be 1200 sq. ft.
Now we know that Total area is equal to product of length and width.

1200 can be written as = 20 × 60, 25 × 48, 30 × 40,60 × 20,48 × 25,40 × 30
Hence the Possible dimension of the ring could be;
20 ft × 60 ft
25 ft × 48 ft
30 ft × 40 ft
60 ft × 20 ft
48 ft × 25 ft
40 ft × 30 ft
Q1 of company A = 2.5
Q3 of company A = 8
Interquatile range = (Q3 - Q1)/2 = (8 - 2.5)/2 = 5.5/2 = 2.75
Q1 of company B = 2
Q3 of company B = 5.5
Interquatile range = (5.5 - 2)/2 = 3.5/2 = 1.75
Therefore, t<span>he interquartile range for Company A employees is 2 more than the interquartile range for Company B employees.</span>