1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
My name is Ann [436]
3 years ago
6

PLEASE HELP ASAP!!

Mathematics
2 answers:
12345 [234]3 years ago
7 0

Answer:

2700 because

Step-by-step explanation:

I multiplied 900 by 3

julsineya [31]3 years ago
4 0

Answer:

2700

Step-by-step explanation:

You might be interested in
Which linear inequality is represented by the graph?
Virty [35]
The answer is the third one down because y moves up 1/3 and it’s 2 away from each even number
7 0
3 years ago
At a camp, kids can choose swimming, art, or music. 40 kids choose swimming, 16 choose art, and 24 choose music. What is the rat
Anna [14]

the ratio would be as follows

40:16

or

5:2

Worded there are five kids who choose to swim to every 2 kids that choose art.

this could also be written as a fraction 40/16 = 5/2

7 0
3 years ago
Read 2 more answers
Can anybody help me?
lakkis [162]

You know that 6x+3 equals 45 because the two sides are equal. So you first put the equation 6x+3=45. Then you use the subtraction property of equality and subtract 3 from both sides. This gives you 6x=42. Then you divide 6 from both sides to get you final answer, x=7

8 0
3 years ago
An assembly line with 10 tasks needs be designed. The total time for all tasks is 16 minutes. If you need to produce 30 units/ho
Sindrei [870]

Answer: 8 minimum work stations is what would be needed.

Step-by-step explanation:

The cycle time is computed as the operating time daily divided by the scheduled output.

It is important to note that the daily capacity of the operation layout is the operating time divided by the cycle time.

Therefore,

If you need to produce 30units/hour.

The average cycle time is as follow:

The average cycle time is the average time between the completions of units.

60/30= 2 average cycle time

=16/2

=8

8 work stations is the minimum number that would be needed.

It is important to know that in an assembly line balancing, the minimum number of work station is the ratio of the sum of all tasks time to the cycle time.

5 0
3 years ago
Simplify.<br> 12<br> 24<br> A) 3<br> 2<br> B) 6<br> 2<br> C) <br> 1<br> 2<br> D) <br> 2<br> 2
AleksandrR [38]
12/24 simplifies to 1/2, seeing as 12 is half of 24. :) Your answer is C.
5 0
3 years ago
Other questions:
  • A maths class has equal numbers of boys and girls. Eight of the girls left early to play in a netball match. This left 3 times a
    13·1 answer
  • 2x2-y if x=3 and y=8
    10·1 answer
  • 1 consider the surface area of the pyramid shown
    10·1 answer
  • Approximately how many more job openings are expected for security guards than pharmacy technicians?
    11·2 answers
  • Can someone please help me with this question?
    12·2 answers
  • If a polynomial function f(x) has roots 3 and StartRoot 7 EndRoot, what must also be a root of f(x)?
    7·2 answers
  • Can y’all help me on question 3?!
    11·2 answers
  • The permiter of a square must be less than 160 feet. What is the maximum length of a side in feet?
    11·2 answers
  • NEED THE ANSWER FAST PLEASE!!!!!
    14·2 answers
  • Mid-West Publishing Company publishes college textbooks. The company operates an 800 telephone number whereby potential adopters
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!