Answer:
It's discrete and non-linear
Step-by-step explanation:
it is not continuous and linear because it does not form a line going in one direction the entire time
Answer:
try to be clear enough so that the answerer can understand
Step-by-step explanation:
.
The correct answer would be
C. All Real Numbers
Answer:
Step-by-step explanation:
The sale price is out of the original price so do 424.15 / 499.00 to find what it is out of in decimal form. Multiply your answer by 100 to find the percentage.
So:
424.15 / 499.00 =0.85
0.85 x 100 = 85
So the answer would 85%.
Hope this helps!
So we need to find the sum of the first 5 terms.
You have told me that the first term is 10 meters, and that r = 0.5 per term.
With this knowledge, we can use the formula s_n=a₁((1-r^n)/(1-r)).
Plugging in the terms that we know...
s₅=10((1-0.5⁵)/(1-0.5))
s₅=10(0.96875/0.5)
s₅=10(1.9375)
s₅=19.375
With s₅, we can determine that the ball has traveled a total of 19.375 meters after 5 bounces.